Come join us for a tour of the Mosquito Road Bridge Project. The project is in its final season and the segmental bridge closure pours will be complete this summer.
The project consists of the construction of a 1,200-foot-long cast in place balanced cantilever bridge approximately 350 feet above the South Fork of the American River accompanied by soil nail and soldier pile walls as well as roadway and drainage improvements.
PPE Required. Hard hat, safety vest, closed toe shoes, safety glasses
You will also be required to sign a waiver.
When:
Friday, May 15, 2026
1:00PM – 5:00PM
Where:
Meet at the Mosquito Road Park & Ride at 1PM 2990 Mosquito Road, Placerville, CA (parking is free)
- We will CARPOOL to/from the project site.
- Afterwards, we’ll walk to Burning Barrel for light bites & a drink (0.5-mi / 11-minute walk)
AFTER PARTY: Webster Engineering will be sponsoring this event. It will include one drink and one food item at Burning Barrel.
If you have any questions, contact Justyn Webster, Webster Engineering/CM Committee Co-Chair, at justyn@websterengineering.net